St. Joseph Cemetery Commission is pleased to announce the road improvements are underway. Many Thanks for your generosity supporting our Cemetery Capital Campaign. Your donations are at work improving our cemetery. Please excuse the inconvenience and drive slowly and safely around the ongoing construction activities. In the lower level new water lines and yard hydrants have been activated. New drainage catch basins at the entrance have been installed. Riprap, rocks have been placed along the slope of the drainage culvert to stabilize the road going to the upper level. Reclaiming, grinding up the roads, making road base gravel throughout the cemetery is completed. Asphalt milling operations, grinding the surface layer will take place soon. Ongoing road grading operations will take place throughout the cemetery. Our goal is to have the roads in most need of improvement starting on the upper level and the intersection of Fr. Foley Ave. and the main road completed by the end of September. Additional Road Improvements will take place in the future, as donations are received. Thank you and God Bless you and your Loved Ones at St. Joseph Cemetery.